|
45 tonne hydraulically
operated remote release system (hydraulic shackle) designed, fabricated and
supplied to SCS for overboarding the
Stabilising Buoy used in the Caisson lowering for the Mossgas E-M extension. This
was activated from a hand operated power pack on the DSV.
|